Thanet St, London

  • 30 Thanet St, London – £6m structural reconfiguration and fit out of 60 high specification student accommodation units
  • Live and on-site – due to be completed at the end of June
  • Project including removing existing RC stairs, replacing lifts, major structural reconfiguration works including the installation of a new internal steel frame, new M&E installations including BMS and smoke ventilation systems, through the full fit-out including bespoke joinery to all units
  • Acting as the estimators and project QSs for the main contractor Datum Point Construction. We assisted in the estimation and negotiation of the works with Datum Point Constructions client have procured all subcontract packages for the project, including setting up collateral warranties, overseeing the coordination of design portions for subcontractors with design responsibility