Silver Package

The Silver package is ideal for Building Contractors who want a detailed  Project Estimate without the need for site visits or meetings. Here is what's included.

Package Inclusions

Site conditions and constraints

As part of the Silver package, AG Surveying will not visit site. The team will therefore price works based on there being good access for plant, materials and muck away, and on the basis the premises will be vacated for the duration of the works unless advised by you, the client.

Prelims

Budgets are calculated based on an estimated duration which the client will approve.

Scaffolding

Provisional Sum to be allowed.

Enabling / Demolition Works

Client to advise if there are any requirements (i.e. relocate gate or fence, take down conservatory etc.). If any requirements are advised then approx budgets for material, plant and waste to be estimated by AG Surveying for client approval.

Groundworks / Foundations

All works to be quantified and priced with labour, plant, muck away and material budgets estimated by AG Surveying for the client to approve. Labour is calculated using market labour rates and approx durations.

Drainage

If no design is in place, a 'provisional sum' will be added to the price for drainage or it is to be excluded if advised by client.

With design provided, approx budgets for material, plant and waste to be estimated by AG Surveying for client approval.

Ground Floor Build Up

All works to be quantified and priced with labour, plant, muck away and material budgets estimated by AG Surveying for client to approve. Labour is calculated using market labour rates and approx durations.

External Walls

All works to be quantified and priced with labour, plant, muck away and material budgets estimated by AG Surveying for client to approve. Labour is calculated using market labour rates and approx durations.

Strip Out Works

AG Surveying estimate approx budgets for labour and waste, and state what rooms and items have been allowed for client approval.

Structural Works

If no design is in place 'provisional sum' to be added to the price for structural works or it is to be excluded if advised by client.

If design is provided, work requirements to be scheduled out with approx budgets for material, plant and waste to be estimated by AG Surveying for each element of works for client approval.

Roof Carcass

Area of roof to me measured, approx budgets for material, plant and waste to be estimated by AG Surveying for client approval. Flat roofs and pitched roofs to be separated.

Roof Covering

Area of roof to me measured, approx budgets for material, plant and waste to be estimated by AG Surveying for client approval. Flat roofs and pitched roofs to be separated.

Fascias, Soffits, Barge Boards & Gutters

Combined linear meter to be measured, all assumed to be in white and black UPVC unless stated otherwise on drawings, approx budgets for material and labour to be estimated by AG Surveying for client approval.

External Windows and Doors

'Provisional Sum' to be added to the price or it is to be excluded if advised by client.

Stairs

If new stairs are shown, ''Provisional Sum' to be added to the price or it is to be excluded if advised by client.

Internal Fit-Out

Work requirements to be scheduled out and quantified with approx budgets for material and labour to be estimated by AG Surveying for each element of works for client approval. Material allowances for doors and ironmongery to be stated so it is clear to home owner what has been budgeted.

Plasterboarding & Plastering

All works to be quantified and priced with market labour and material budgets per square meter estimated by AG Surveying for client to approve. Locations allowed to be stated.

Decorating

All works to be quantified and priced with market labour and material budgets per square meter estimated by AGS for client to approve. Locations allowed to be stated.

Wall & Floor Finishes

Work requirements to be scheduled out and quantified with approx budgets for material and labour to be estimated on meter square rates by AGS for each element of works for client approval. Material allowances for floor and wall coverings to be stated so it is clear to home owner what has been budgeted.

Plumbing & Electrics

Provisional Sum to be allowed for each.

Supply of sanitaryware and shower screens

If specification is provided, obatin prices for the products and estimate accordingly. If not State as 'excluded' or 'Provisional Sum' to be added.

Mastic

Budget allowance to be estimated.

Build Clean

Budget allowance to be estimated.

External Works / Landscaping / Alterations / Making Good

Provisional Sum to be allowed.

 

Package Exclusions

  • Site visit
  • Kitchen (Including worktop)
  • Review meeting prior to issuing price